Equipment assignment to multiple overhaul blocks in series systems

Document Type

Article

Publication Date

11-28-2002

Abstract

This paper covers the development of a heuristic method for grouping equipment into blocks for application of preventive maintenance overhauls within a series system, so as to minimize total maintenance-related costs for the system. Previously, group technology (GT) concepts have not been applied to this problem, and this research investigated the applicability of such concepts to the block overhaul problem (specifically, the SLCA method was applied). Performance of the heuristic is analyzed with respect to runtime and solution quality.

Publication Source (Journal or Book title)

Journal of Quality in Maintenance Engineering

First Page

319

Last Page

330

This document is currently not available here.

Plum Print visual indicator of research metrics
PlumX Metrics
  • Citations
    • Citation Indexes: 16
  • Usage
    • Abstract Views: 1
  • Captures
    • Readers: 19
see details

Share

COinS