Document Type
Article
Publication Date
3-1-2005
Publication Source (Journal or Book title)
Computers and Industrial Engineering
First Page
445
Recommended Citation
Jamal, A., Sarker, B., & Mondal, S. (2005). Erratum: Optimal manufacturing batch size with rework process at a single-stage production system (Computers and Industrial Engineering (2004) 47: 1 (77-89) DOI: 10.1016/j.cie.2004.03.001). Computers and Industrial Engineering, 48 (2), 445. https://doi.org/10.1016/j.cie.2004.09.005
COinS