Construction delay computation method

Document Type

Article

Publication Date

1-1-2001

Abstract

Delay is one of the most common problems in the construction industry. This paper presents a method for computing activity delays and assessing their contributions to project delay. The method consists of a set of equations, which can be easily coded into a computer program that allows speedy access to project delay information and activity contributions. The proposed method contrasts the as-planned and as-built schedules. It is not based on critical path analyses; therefore, it does not require the calculation or updating of the critical path, and it is even not necessary to update the as-planned schedule, as required by the traditional delay analysis methods. The results calculated from the proposed method include various variations of activity schedules and their contributions (in days) to the overall project delay. They provide an objective baseline for determining responsibilities of delays. The method can be integrated into any delay analysis system to further improve and automate the construction delay analysis process. Practical examples are used to illustrate the computation mechanism.

Publication Source (Journal or Book title)

Journal of Construction Engineering and Management

First Page

60

Last Page

65

This document is currently not available here.

Share

COinS